Summerland Marina and Landscaping

Summerland Marina
• Dredging: 17,000m3
• Breakwater Rocks: 150,000m3
• Concrete Armored Block (12m3): 3,300 Accropodes
• Crest Walls 6m height: 6,200m3
• Quays on Piles: 5,000m3
• Captaincy, MEP and Miscellaneous works.

Summerland Landscaping
• Design scope: Soft and hard landscaping, structure and MEP,
• Infrastructure: Sewage water network, Rain water network, Water supply network, Irrigation network, Fuel network, Power and Low Current networks,
• Civil Works: Shoring, dewatering, excavation and concrete works,
• Finishing works,
• Swimming pools, basalt paved vehicular road, Stone and wooden paved terraces, Beverage area, Tennis court and Wooden Bungalows with Jacuzzis.

Share On

Summerland Marina and Landscaping

Gallery

Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
Summerland Marina and Landscaping
#
Loading
Stay up to date
Subscribe to our newsletter for our latest news lorem Ipsum is simply for our latest news lorem Ipsum is simply.